2004 SR Johnson 2 Stroke 9.9, 15, 25, 30 HP Outboards Service Manual, Page 265Get this manual

2004 SR Johnson 2 Stroke 9.9, 15, 25, 30 HP Outboards Service Manual, Page 265

GEARCASE REMOVAL AND INSTALLATION Move the shift lever until the upper shift rod engages the lower shift rod connectorWhile holding the lower shift rod connector, tighten the upper shift rod connector securely
RAND TE MODELS Adjust the shift lever (actuator cam) and the neutral start switchRefer to Shift Linkage Adjustment on p.177, and NEUTRAL START PROTECTION on p178
EL MODELS
Rotate the propeller shaft and move the shift lever to shift gearcase into NEUTRAL positionLoosen both shift lever screwsAdjust the shift lever to align with the centerline of the crankshaftTighten the shift lever screws to torque to 60 to 84 in Ibs(7 to Nm)