2004 SR Johnson 2 Stroke 9.9, 15, 25, 30 HP Outboards Service Manual, Page 216Get this manual

2004 SR Johnson 2 Stroke 9.9, 15, 25, 30 HP Outboards Service Manual, Page 216

POWERHEAD INSTALLATION2530 RAND TE MODELS Install the neutral start plunger and spring through the component bracketUsing pin, secure plunger as shownRotate the propeller shaft and shift the engine into REVERSE Place the actuator cam link into the shift actuator camSecure the link with the washer and pin
1Actuator cam link 2Shift actuator cam

After checking ignition plate routing, install the component bracket, neutral start plunger, lockout lever, pivot screw, and flat washer, as shownTighten pivot screw to 60 to 84 inIbs(7 to Nm)Remove the pin securing the plunger