1999 "EE" Evinrude 70HP 4-Stroke Service Manual, P/N 787023, Page 200Get this manual

1999 "EE" Evinrude 70HP 4-Stroke Service Manual, P/N 787023, Page 200

Manifold and Reservoir Installation
1Lubricate five new manifold body a-ringsPlace them in the cylinder bodyInstall orifice collar in hole Install reducer orifice in hole if removed2Attach the valve pump assembly to the cylinder body with three screwsTighten screws to 60-84 inIbs(7-9 Nm)
[] 3Oil and install the manual release valveThread the valve just past the snap ring grooveDo not install the snap ring at this timeYou will be removing the valve for the "Pressure Leakdown Test"