1999 "EE" Evinrude 5 thru 15 4-Stroke Service Manual, P/N 787022, Page 306Get this manual

1999 "EE" Evinrude 5 thru 15 4-Stroke Service Manual, P/N 787022, Page 306

2Remove the positive connection (red) for the battery cable and engine wiring harness at the solenoid[IQ]

3Remove the yellowred and black wires from the top of the solenoidRemove the wire from the pressure switchIf equipped, remove bullet connectors from temperature switch and primer
4Disconnect the two Amphenol and three bullet connectors from the engine wiring harness
rn 5.flywheelremove thecable remaining screws and starterDisconnect starter from solenoidLoosen the screw under two
[] 6Remove screws retaining the solenoidRemove solenoid7Remove screws retaining rectifierregulator and bracketRemove rectifierregulator and bracket
Installation

1Install rectifierregulator and bracketTorque screws to 60-84 inIbs(7-9 Nm)
[] 2Position solenoid and install screws securely
rn 3.Install cablestarter solenoid andscrews nut14-16 ftinIbs(7-9 Position and torque to Ibs(19-22 Nm)from torque to 60-84