1999 "EE" Evinrude 200, 225 V6 FFI Outboards Service Manual, P/N 787025, Page 231Get this manual

1999 "EE" Evinrude 200, 225 V6 FFI Outboards Service Manual, P/N 787025, Page 231

13s1 1361 1371
21Push the propeller shaft out of the bearing housing22Remove the thrust bearing

and thrust washer
23Remove both seals using OMC Puller Bridge, PIN 432127, and OMC Small Puller Jaws, PIN 432131 Position plate on top of housing to support bridge and tighten jaws securely behind lower seal
13SliNoteilnspect bearings in placeIf bearing is removed for
any reason, it must be discarded24Remove either bearing using OMC Puller Bridge, PIN 432127, and OMC Large Puller Jaws, PI 432129Rest puller plate on top of housing to support bridge and tighten jaws securely behind bearing25Clean housing and bearings in solvent and dry thoroughlyIf bearings were not replaced, rotate needles with your fingers to check for freedom of movementInspect O-ring groove and sand off any sharp edges that would cut O-ring and prevent its sealing