1999 "EE" 90, 115 FFI, 150, 175 V4, V6 FFI Outboards Service Manual, P/N 787024, Page 243Get this manual

1999 "EE" 90, 115 FFI, 150, 175 V4, V6 FFI Outboards Service Manual, P/N 787024, Page 243

7Lightly coat the detent ball and spring with OMC Needle Bearing Assembly GreaseFirst, insert the spring in the housing, then the ball
rn to the detent detentMake sureinto the housing, and the spring8Insert the lever push it up next ballthe ball is resting on
Insert screwdriver into the opposite end of the detent lever passageSimultaneously, depress the ball while pushing in on the detent lever until it snaps into NEUTRAL position] 9Place the cradle on the shift shaftthen rest the shifter on the cradleSlide the shaft into the housing and insert the shifter tip into the detent's pocket[] 10Install the pivot pin]11Thoroughly grease the original 25 needles with OMC Needle Bearing Assembly Grease and place in the bearing case13614