1998 Johnson Evinrude "EC" 90, 115 SPL Service Manual, P/N 520209, Page 192Get this manual

1998 Johnson Evinrude "EC" 90, 115 SPL Service Manual, P/N 520209, Page 192

,V6Remove the two screws, washers, and retainers
4Remove the propeller shaft bearing housing from the gearcase using the following:

V4From OMC Universal Puller Kit, PI 378103, use two
PI 316982 puller legs and the puller body V6 From OMC Universal Puller Kit, PIN 378103, use the puller body, pressing screw, and handle From local supplier, use two 516-18 11 in(279 mm) threaded rods, two large 516 inI.Dflat washers, and two 516-18 nuts
COA3161

Assemble components and pull the bearing housing from the gearcase
5V4If equipped, remove the two retaining rings using OMC Retaining Ring Pliers, PIN 331045Retaining rings are under extreme pressure during removal and installationWear safety glasses and proceed with care to avoid unsnapping the ring from your pliersAfter the retaining rings are removed far enough from the gearcase to clear the housing, release pliers tension while the retaining ring is still around the propeller shaft6V4Remove the retainer plate from the gearcase