1998 Johnson Evinrude "EC" 90, 115 SPL Service Manual, P/N 520209, Page 38Get this manual

1998 Johnson Evinrude "EC" 90, 115 SPL Service Manual, P/N 520209, Page 38

Synchronization and Linkage Adjustments I Note It is important that this step-by-step procedure be followed

in sequence and be performed exactly as written to ensure consistent engine idling and smooth operation throughout the RPM rangeINotel Remove both remote control cables from the engine

before performing the following adjustmentsTiming Pointer
I Note Ifthe timing pointer or intake manifold has been disturbed,

check the top dead center timing pointer alignment
1To prevent accidental starting of the motor, disconnect the spark plug leads and remove the spark plugs

2Center the timer pointer Rotate the flywheel in clockwise direction until the cast-in TOC mark is approximately 11f2 in(4 cm) past the timing pointer12223

rn andInstall in center portion PIN 384887, in No.1No.1 piston3OMC Piston Stop, spark plug hole turn until it contacts the
Lock the tool in place with ring