1998 Johnson Evinrude "EC" 125C, 130, 200, 225, 250 90 deg LV Service Manual, P/N 520212, Page 158Get this manual

1998 Johnson Evinrude "EC" 125C, 130, 200, 225, 250 90 deg LV Service Manual, P/N 520212, Page 158

Ohmmeter Test

All ohmmeter tests must be performed with engine NOT running
1Calibrate ohmmeter on appropriate scale2Attach ohmmeter black lead to port timer base connector, terminal "E"
3Alternately, attach ohmmeter red lead to each terminal in starboard timer base connectorObserve meter reading at each connection

I 4Alternately, attach ohmmeter red lead to each terminal in port timer base connectorObserve meter reading at each connection Meter must show 45 10 ohms