1997 Johnsoon Evinrude "EU" 50 thru 70 3-Cylinder Service Manual, P/N 507266, Page 254Get this manual

1997 Johnsoon Evinrude "EU" 50 thru 70 3-Cylinder Service Manual, P/N 507266, Page 254

RectifierRegulator Tests Variable Load Tests To test the operation of the rectifierregulator, you must be able to run the engine continuously at approximately 4500 RPM, either in test tank, on marine dynamometer, or on the boatThe test consists of monitoring the system's response to partially discharged batteryTwo methods for performing this test are described belowVariable Load High Rate Discharge Tester
INotel The rectifierregulator requires battery voltage on the

purple lead to operateBefore proceeding, verify battery voltage at terminal strip purple leads when key is ON
1Disconnect battery cables
2Connect to 40 amp ammeter in series between the rectifierregulator red lead and the battery side of the starter solenoid
3Reconnect the engine's battery cables4Following the manufacturer's directions, connect the variable load tester (carbon pile) across the battery terminalsStevens Model NoLB-85 and Snap-on Model NoMT540D are examples of testers available