1996 Johnson Evinrude "ED" 90 LV 125C, 130, 200, 225, 250 Service Manual, P/N 507128, Page 316Get this manual

1996 Johnson Evinrude "ED" 90 LV 125C, 130, 200, 225, 250 Service Manual, P/N 507128, Page 316

12 12308 COA3568

r:;;;l16Locate the propeller shaft assembly and orient the forward bearing housing with the detent lever toward the topPush the detent lever down into REVERSE positionBe sure the thrust bearing and the thrust washer are properly positionedInsert the propeller shaft assembly into the gearcase, being sure to align the shift housing pin with hole in forward end of gearcase housing
f11l1217
Lubricate two new shift rod cover a-rings with OMC Triple-Guard greaseInstall the a-rings into the shift rod coverPlace the shift rod grommet and shift rod spacer (TX, TZ models) on the shift rodGrease the threaded end of the shift rod and insert it through the coverTurn the shift rod while pushing it through the cover to avoid damaging the a-ringsnew shift rod cover gasket Position the gasket on the gearcaseInsert the shift rod and cover assembly into the gearcase as shown, and thread the shift rod into the detent lever about four turns19Move shift rod from side to side while pushing on the propeller shaft to ensure proper alignment of the bearing housing locator pin into the locator pin hole in the gearcaseTap the end of the propeller shaft with plastic or rawhide mallet to fully seat the bearing housing