1996 Johnson Evinrude "ED" 60 LV 90, 115, 150, 150C, 175 Service Manual, P/N 507127, Page 213Get this manual

1996 Johnson Evinrude "ED" 60 LV 90, 115, 150, 150C, 175 Service Manual, P/N 507127, Page 213

35 21Push the propeller shaft out of the bearing housing36 22Remove the thrust bearing and thrust washer 37 23Remove both seals using OMCPuller Bridge, PIN 432127, and OMC Small Puller Jaws, PIN 432131Position plate on top of housing to support bridge and tighten jaws securely behind lower seal3s INotellnspect in If bearing is removed for any reason, It must be discarded24Remove either bearing using OMC Puller Bridge, PI 432127, and OMC Large Puller Jaws, PIN 432129Rest puller plate on top of housing to support bridge and tighten jaws securely behind bearing25Clean housing and bearings in solvent and dry thoroughlyIf bearings were not replaced, rotate needles with your fingers to check for freedom of movementInspect O-ring groove and sand off any sharp edges that would cut O-ring and prevent its sealing1391 26To replace the large bearing, lightly coat the outside case with gearcase oilFace the lettered end of the bearing case toward the large diameter end of OMC Bearing Installer, PIN 432401, and slide it onto toolPress bearing into housing until the tool seats1401 27To replace the small bearing, lightly coat the outside case with gearcase oilPlace lettered end of bearing case on small diameter end of OMC Bearing Installer, PI 339750, then press bearing into housing until the tool seats E u