1994 Johnson Evinrude "ER" 60 LV 150, 150C, 175 Service Manual, P/N 500611, Page 241Get this manual
Solenoid Check All engine wiring must be disconnected from the solenoid before proceeding with this test
fij 1Calibrate ohmmeter on appropriate scaleConnect one lead
to terminal and the other lead to terminal
Ohmmeter should show high reading 24082
If ohmmeter shows low reading, replace the solenoid
iaj 2With the ohmmeter still connected as described in Step 1,
attach positive battery jumper to terminal and negative battery jumper to terminal The solenoid should close with an audible click Ohmmeter should show low reading If ohmmeter shows high reading, replace the solenoid3After installing the solenoid, coat all wires and terminals, except the battery "+" connection, with OMC Black Neoprene Dip