1993 Johnson Evinrude "ET" 60 thru 70 Service Manual, P/N 508284, Page 178Get this manual

1993 Johnson Evinrude "ET" 60 thru 70 Service Manual, P/N 508284, Page 178

6Lubricate and place the bushings in the swivel bracket 12217Place the swivel bracket in the stern bracketsLu bricate

and place the thrust washer between the stern brackets and swivel bracket8TTL ModelsInsert the tilt tube through the stern and

ill swivel bracketsTighten the tilt tube nut to torque of 50-54
ftIbs(68-73 Nm)Then, back off nut 1Ja to 14 turn after applying torque

bracket and thrust washer into the swivel bracket centerInstall the steering friction handle guard on the tilt bolt with the lip upPush the tilt bolt through the port side of the swivel bracket, thrust washer, and stern bracketInstall the other washer and the nutTorque the nut to 14-16 ftIbs(19-22 Nm)
ill tilt boltsInsert the tilt bolt through the starboard stern

9Manual Tilt ModelsPlace one tilt bolt washer on the

123110Install the shock absorber upper pin through the swivel bracket and shock absorber rod endInstall the spring clip