1993 Johnson Evinrude "ET" 60 thru 70 Service Manual, P/N 508284, Page 44Get this manual

1993 Johnson Evinrude "ET" 60 thru 70 Service Manual, P/N 508284, Page 44

Synchronization and Linkage Adjustments -
60TTL,65RS,70TTL

It is important that this step-by-step procedure be followed in sequence and be performed exactly as written to ensure consistent engine idling and smooth operation throughout the RPM rangeThe flywheel has two timing gridsFor TTL models, use the second timing grid (flywheel rotating in clockwise direction); 65RS, use the timing grid marked "Rope"Set Timing Pointer If the timing pointer or intake manifold has been disturbed, check the top dead center timing pointer alignment
ill ing, twist and remove all spark plug leads

1To prevent accidental starting of the engine while servic-

[':;l 2Center the timer pointer Rotate the flywheel in L!J clockwise direction until the cast-in mark is approximately 112 in(4 cm) past the timing pointer
r:;j 3Install OMC Piston Stop, PIN 384887, in No1 spark plug hole and turn in center portion until it contacts the No.1 pistonLock the tool in place with ring