1992 Johnson Evinrude "EN" 60 deg Loop V Service Manual, P/N 508146, Page 188Get this manual

1992 Johnson Evinrude "EN" 60 deg Loop V Service Manual, P/N 508146, Page 188

r:J6l 20Apply OMC Gasket Sealing Compound to the threads of the shift rod cover screwsInstall the screwsTighten the screws to torque of 60-84 inIbs(7-9 Nm) 1"17l 21 Position the driveshaft thrust bearingthrust washerand shim(s) (selected earlier) on the driveshaftIn

bearingwasherand shim(s) exactly the order shown
1181 22Apply light coat of OMC Gasket Sealing Compound to the gearcase area that contacts mounting flange of the bearing housingDo not coat inside bearing housing bore surface of the gearcaser:t9l 23Using OMC Driveshaft Seal Protector, PIN 318674, slide the driveshaft bearing housing onto the driveshaft24Pull up on the shift rod to engage FORWARD gearTurn the gearcase upside down by rotating the holding fixtureBe sure any excess grease is removed from the pinion needle bearingsDegrease inside taper of the pinionPosition the pinion in the gearcase25Degrease the driveshaft taper and install the driveshaft26Lightly coat the threads of the pinion nut with outboard lubricant and install on the driveshaftTurn the driveshaft by hand to engage the nut1201 27Turn the gearcase right side upUsing OMC Driveshaft Socket, PIN 311875, and OMC Pinion Nut Holder, PIN 334455, torque the pinion nut to 70-80 ftIbs(90-108 Nm)