1990 Johnson Evinrude "ES" Cross V 88 thru 115, 150 thru 175, P/N 507874, Page 267Get this manual

1990 Johnson Evinrude "ES" Cross V 88 thru 115, 150 thru 175, P/N 507874, Page 267

COA3130
1201 25Position the driveshaftthrust bearingthrustwasherand shim(s) (selected earlier) on the driveshaft
INotel Position items, and

exactly in the order shown
f2.1l 26Lightly apply OMC Gasket Sealing Compound to the gearcase area that contacts mounting flange of the bearing housingDo not coat inside bearing housing bore surface of the gearcase1221 27Using OMC Driveshaft Seal Protector PIN 318674, slide the driveshaft bearing housing onto the driveshaft28Push down on the shift rod to engage REVERSE gearTurn the gearcase upside down by rotating the holding fixtureDegrease taper of the pinionPosition the pinion in the gearcase29Degrease the driveshaft taper and install the driveshaft30Lightly coat the threads of the pinion nut with outboard lubricant and install on the driveshaftTurn the driveshaft by hand to engage the nut1231 31Turn the gearcase right side upUsing OMC Driveshaft Socket PIN 311875 and OMC Pinion Nut Holder PIN 334455, torque the pinion nut to 70-75 ftIbs(90-102 Nm)Overtorquing or undertorquing the pinion nut will reduce pinion lifeDo not re-use damaged pinion nuts1241 32Position the washers on the driveshaft bearing housing screwsApply OMC Gasket Sealing Compound to the threads ofthe screwsInstall and tighten screws to torque of 168-192 inIbs(19-22 Nm)