1988 Johnson Evinrude CC 60 thru 75 outboards Service Manual, Page 298Get this manual

1988 Johnson Evinrude CC 60 thru 75 outboards Service Manual, Page 298

ill spring into housingTo prevent possible eye injury

10Install detent roller, detent shoeand detent

from detent spring, wear safety glasses while installing shift and throttle plate
j27 11 Place spring washer onto splined hub of shift and throttle plate128112Be sure shift and throttle plate are free of dirt and gritInstall shift and throttle plate bushing into housingRetract detent spring and install shift and throttle plateTeeth of shift and throttle plate must engage teeth of shift lever assembly128113Place neutral start switch mounting plate in positionInstall neutral start switch with two screwsTighten screws to torque of 15-20 inIbs(1,7-2,3 Nm)128114Install friction adjustment lever with friction adjustment screw into housing128115Install retainer plate CD to housingTighten screw to torque of 25-35 inIbs(2,8-3,9 Nm)16Check to be sure no wires are being pinchedLubricate shift lever post and three assembly screws with OMC Triple-Guard grease17Reassemble two halves of remote control, taking care to properly pilot the electrical cable grommet into the housingTighten screws to torque of 40-50 inIbs(4,6-5,5 Nm)18Pull up on the neutral lock slide and install handle spline into spline of remote control so slide will engage notch of index plateInstall Allen head screwTighten screw to torque of 100-120 inIbs(11-14 Nm)