1968 Evinrude Starflite 100 HP outboards Service Manual, Page 74

GUIDE PLATE #311759
coilReadings less than specifications indicate short circuit such as bare lead running to groundINSTALLATION OF THE UPPER NEEDLE BEARING AND THE LOWER ROLLER BEARING 1Place the upper needle bearing on the Needle Bearing Installer (Special Tool #311876)Place the lower roller bearing on the Pilot from Roller Bearing Installer (Special Tool #380758)Place the stud #312019 from Needle Bearing Inner Race Remover (Special Tool #380759) through the driveshaft openingThe end of stud with 12" of thread must be at the bottomPlace the lower roller bearing (on Bearing Installer) into the gear case and attach the installer to the stud inserted in step abovePlace the upper needle bearing (and Bearing Installer) on the top of the studNext place the 38" flat washer and the 38-16 Hex Nut from Roller Bearing Installer Assembly (Special Tool #380758) on the studDraw up on the nut until both bearings are seated, Figure 6-353
4Figure 6-33Propeller Shaft Bearing Cup Installer 5cAssemble the Front Coil and Lead Assembly Installer (Special Tool #380691) and #311880 Drive HandlePlace the coil and lead assembly on the Body of the Installer as shown in Figure 6-34Attach an extra lead with knife disconnect to the front coil leadFeed this wire into the gearcase and up through the forward coil lead openingBe careful so as not to damage the connection between the coil and leadInsert the coil and Installer Assembly into the gear case so that the coil lead is at the top of coilCarefully pull attached lead while feeding the coil and Installer Assembly into the gearcase