Chrysler 75 and 85 HP Outboards Service Manual OB 3646, Page 87Get this manual

Chrysler 75 and 85 HP Outboards Service Manual OB 3646, Page 87

Installation 1Assemble distributor housing as followsAInstall distributor control rod link assemblyFigure 36
CSecure ground lead to distributor with screw and lockwasherDInstall preamplifier on housing, secure with two (2) screws and lockwasher; connect preamplifier leadsFigure 38
Figure 36Installing Distributor Control Rod Link Assembly
Figure 38Installing Preamplifier
BInstall terminal screw posts and insulators on distributor housing Figure 37