Chrysler 70, 75 and 85 HP Outboard Motors Service Manual OB 3438, Page 87Get this manual
Installation 1Assemble distributor housing as follows: AInstall distributor control rod link assemblyFigure 36
CSecure ground lead to distributor with screw and lockwasherDInstall preamplifier on housingsecure with two (2) screws and lockwasher; connect preamplifier leadsFigure 38
Figure 36Installing Distributor Control Rod Link Assembly
Figure 38Installing Preamplifier
BInstall terminal screw posts and insulators on distributor housing Figure 37