Chrysler 20 and 30 HP Outboard Motors Service Manual OB 3435, Page 115Get this manual

Chrysler 20 and 30 HP Outboard Motors Service Manual OB 3435, Page 115

ECheck choke operation by pushing down on plunger with screwdriver until it bottoms in the solenoidThe choke shutter should only be open enough to allow the paper to be pulled outFigure 30 If not, reposition solenoid and recheck Figure 29Removing Choke Solenoid
2Remove two (2) hex head screws securing solenoid to bracket and remove clamp Remove choke solenoid by pulling it away from plunger3Remove band securing wire to solenoid Testing and RepairEquipment: Ohmmeter (R 1

Figure 30Checking Choke Operation

Scale)1Place positive test lead on terminal of solenoid Place negative lead on solenoid caseMeter should indicate 0.51.35 ohms If not, part is defective and must be replaced Installation
4Connect green wire to terminal post on solenoid and secure wire to post with lockwasher and nutFigure 30 5Install tie wrap around solenoid and over wire to secure wire to solenoid Figure 31