2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 495Get this manual

2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 495

APPENDIX 16-43 Cable, Wire and Hose Routing
Refer to the Exploded View and Flow Diagram in the Cooling and Bilge Systems chapterInstall the clamp as shown, noting its screw head direction1Bypass Outlet 2Clamp 3Holder 4Bypass Outlet Hose 5Flushing Hose 6to Flushing Fitting 7Deck 8Exhaust Manifold 9Muffler Body 10Output Cover 11 Flushing Hose for Intercooler 12Protect Tube 13Cooling Hose (IntercoolerHull) 14Drain: Position the screw head, as shown15Cooling Hose (PumpRear of Cylinder Head) 16Pump 17Position the clamp so that its screw head faces downward and outside18Cooling Hose (PumpOutput Cover) 19Cooling Hose (PumpIntercooler) 20Cooling Hose (Muffler BodyHull): Run the cooling hose to the starboard side of bilge hose21Intercooler 22Cooling Hose (Output CoverOil Cooler) 23Cooling Hose (Oil CoolerFront of Cylinder Head) 24L Shape Side