2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 397Get this manual

2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 397

14-38 ELECTRICAL SYSTEM Ignition System
Apply grease to the O-ring and fit it in the groove of the sensor cover Apply silicone sealant [A] to the crankcase halves mating surface on the right and left sides of the crankshaft sensor mountSealantLiquid Gasket, TB1211: 56019-120

Install the crankshaft sensor coverTorqueCrankshaft Sensor Cover Bolts: kgfm69 inlb) 7.8 Nm (0.80
J N080890S C

Timing Rotor Removal
Remove the engine (see Engine Removal in the Engine RemovalInstallation chapter) Remove the crankshaft sensor cover (see Crankshaft Sensor Removal) Remove the timing rotor [A] OHolding the timing rotor with the flywheel and pulley holder [B] and unscrew the bolt [C] Special ToolsFlywheelPulley Holder: 57001-1605 Flywheel and Pulley Holder Adapter: 57001 -1547 [0]

Timing Rotor Installation
Fit the rotor to the crankshaft Apply non-permanent locking agent to the rotor bolt Tighten the rotor boltTorqueTiming Rotor Bolt: 20 Nm (2.0 kgfm14 ftlb)