2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 385Get this manual

2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 385

14-26 ELECTRICAL SYSTEM Electric Starter System
Starter Relay Removal
Remove: Battery Cover (see Battery Cover RemovalInstallation) Battery (see Battery Removal) Disconnect the negative battery cable from the battery terminal(see Battery RemovalDisconnect the starter relay lead connector [A] Slide out the rubber caps [B] Remove the nuts [C] from the battery and starter terminals on the start relay switch Remove the starter relay case bolts [0] and slide the starter relay switch from the relay case [EJ, being careful not to lose any of the insulating washers or grommets
Starter Relay Installation
Mount the starter relay switch [A] in the relay case [B]OCoat the insulating washers [C] and grommets [0] with water resistant grease OBe certain all insulating washers and grommets are in position OTighten the relay mounting nuts [E] securelyTorqueStarter Relay Mounting Nuts: Nm (0.40 kgf.m35 inlb)