2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 256Get this manual

2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 256

ENGINE BOTTOM END 8-9 Coupling
InstallPins [A] Gasket [B] Position the magnet lead [C] as shown
Apply grease to the oil seal lip Install the output coverORun the magneto lead [A] between the magneto cover [B] and the output cover [C] as shown TorqueOutput Cover Bolts: 7.8 Nm (0.80 kgfm, 69 in.lb)

JII0 00 BS I

Install the coupling by using the old timing rotor as holding toolOApply non-permanent locking agent to the threads of coupling (JT1500E9FF9FModels)Special ToolsFlywheelPulley Holder: 57001-1605 Holder Attachment: 57001-1547 Coupling Holder #257001-1423 TorqueCoupling110 Nm (11 kgf.m81 ftlb)