2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 184Get this manual

2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 184

4-20 ENGINE LUBRICATION SYSTEM Oil Pump Sprocket, Oil Pump and Oil Pressure Relief Valve
Install the oil pump chain guide [A], collar [B], washer [C] and bolt [D] as shownOlnstall the collar so that the flat surface of the collar faces to crankcase Tighten:
TorqueOil Pump Chain Guide Bolt: 7.8 Nm (0.80 kgf.m69 inlb)
J0 1000BSl C

Install the chain guide spring [A] and the spring plate [B] Olnsert the tab [C] of the spring plate in the hole [D] of the crankcase TorqueChain Guide Spring Plate Bolt: kgfm69 inlb) 7.8 Nm (0.80

InstallOil Pan (see Oil Pan Installation)