2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 56Get this manual

2007-2010 Kawasaki Ultra 250X/260X/260LX PWC Factory Service Manual, Page 56

2-34 PERIODIC MAINTENANCE Periodic Maintenance Procedures
Hose and Hose Connect Inspection
Check the following hoses for leakage [AJ, hardeningcracking [B], checkingcuts, abrasions, breaks and bulges [C]And make sure the hoses are not kinked or pinchedFuel Vent Hose Oil Hoses Cooling Hoses Bilge Hoses If hose is damaged in any way, replace it immediately and check all the others for damage
Make sure the above hoses are routed properly and secured with the clamps away from any moving parts and sharp edged portionsPlastic Clamp [Aj Hose [Bj Hose Fitting [C]

o The majority of bilge hoses have no clamps at the hose
endsJB0 00JDS 1

Metal Clamp [Aj Hose [Bj Hose Fitting [C]
deterioration, damage or leakageReplace if necessaryO Make sure the above tubes are secured with the metal gear clamps away from any partsJBO?002RS C