2003-2005 Kawasaki Ultra-150 Jet Ski Factory Service Manual., Page 187Get this manual

2003-2005 Kawasaki Ultra-150 Jet Ski Factory Service Manual., Page 187

HULLENGINE HOOD 13-11 Fittings
Cro ssmember Insta lla tion
l es Appayll ghreabsuesitnogthA] bnutoinhgehole [B] of the crossmemberInst [i Apply non-permanent ltocking agent to the crossmem ber mounting bolts and torque themTorqueCrossmember Mounting Bolts: 7.8 Nm (0.8 kgfm, lb )

h Rrun ktete throttle cable [A] into the tube of the steering ac
Be sure the rubber boot [B] on the cable
Grip and Re ar Du ct RemovalInstallation