2003-2005 Kawasaki Ultra-150 Jet Ski Factory Service Manual., Page 167Get this manual

2003-2005 Kawasaki Ultra-150 Jet Ski Factory Service Manual., Page 167

12-4 STEERING Steering Cable
Steering Cable Adjustment
he ng abl Centcekr stheeehiandclebaer iandtjhstmteanitg.ht-ahead positionesr C

Cahveitcykthat the steering nozzle is centered [A] in the pump c

Loosen the locknut [A] on the steering cableTake out the cable joint bolt [B] and disconnect the cable Turn the joint on the cable to adjust the steeringTemporarily tightening the cable joint bolt, connect the
joint [C] from the teering nozzlejoint with the nozzle and check cable adjustment againWhen adjustment is correct, unscrew the cable joint bolt and apply non-permanent locking agent to itAnd tighten the cable joint bolt and the steering cable locknut securelyTorqueCable Joint Bolt: 9.8 Nm (1.0 kgfm, 87 inlb)