2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 451Get this manual

2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 451

SteeringHandlebar: Install the handlebarsRefer to "Handlebars Removal and Installation (Page 6B-3)" Check the steering moves smoothly Check the wiring harness routing, cable routing and brake hose routingRefer to "Wiring Harness Routing Diagram in Section 9A (Page 9A-3)", "Hose and Cable Routing Diagram in Section 4A (Page 4A-3)" and "Front Brake Hose Routing Diagram in Section 4A (Page 4A-1)" After installing the removed parts, inspect the toe-inIf the toe-in is out of specification, bring it into the specified rangeRefer to "Toe-out Adjustment (Page 6B-11)" 6B-10

Tie-rod end Inspect the tie-rod ends for smooth movementIf there are any abnormalities, replace the tie-rod ends with new onesInspect the tie-rod end boots for wear or damageIf any defects are found, replace the tie-rod ends with new ones