2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 449Get this manual

2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 449

SteeringHandlebar: Temporarily install the lock-nuts (4), (5) and tie-rod end (6) to the tie-rod (7)NOTE The lock-nuts (4) have left-hand threads 6B-8

Apply grease to the dust seal lip and steering shaft holders before remounting the steering shaft holders: Grease 9900025160 (Water resistance grease or equivalent)!
CAUTION

To prevent the entry of dirt, the dust seal end "A" must face forward when installing the dust seals to steering shaft

I933H1620028-02

When installing the tie-rods, make sure the narrow end "a" of tie-rod comes outside"a" "a" "A"