2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 302Get this manual

2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 302

2B-7 Front Suspension: Installation Install the front wheel hub and steering knuckle in the reverse order of removalPay attention to the following points: Degrease the tapered position of knuckle and also knuckle end and tie-rod end with nonflammable cleaning solvent Apply grease to the dust seal lips, collar and spacer: Grease 9900025160 (Water resistance grease or equivalent)
I933H1220023-02

Apply thread lock to the brake disc cover mounting boltsI933H1220020-01

: Thread lock cement 9900032130 (THREAD LOCK CEMENT SUPER 1360 or equivalent)