2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 278Get this manual
Charging System:
Generator Removal and Installation
8) Remove the gasket (5) and dowel pinB933H21A06004
Removal 1) Drain engine oilRefer to "Engine Oil and Filter Replacement in Section 0B (Page 0B-11)"2) Disconnect the reverse lock release cable(for transmission side) Refer to "Gear Position (GP) Switch Removal and Installation in Section 5B (Page 5B-12)"3) Remove the starter torque limiterRefer to "Starter Torque LimiterStarter Clutch Removal and Installation in Section 1I (Page 1I-8)"4) Disconnect the CKP sensor coupler (1) and generator coupler (2)
I933H11A0008-01
9) Remove the starter idle gear (6) and shaft (7) with the washers6