2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 152Get this manual

2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 152

Engine Mechanical: Installation Install the throttle body in the reverse order of removalPay attention to the following points: NOTE When installing the throttle body, fit the concave part of the intake pipe onto the convex part of the throttle body 1D-10

3) Remove the fuel injector (3) from the fuel delivery pipe (2)
I933H1140239-02

4) Remove the TP sensor (4) with the special toolSpecial tool0993011950 (Torx wrench) NOTE
I933H1140025-01

Tighten the throttle body clamp screwsRefer to "Throttle Body Construction (Page 1D-8)" Connect the starter cableRefer to "Hose and Cable Routing Diagram in Section 4A (Page 4A-3)" Adjuster the throttle cable playRefer to "Throttle Cable Play Inspection and Adjustment (Page 1D-5)"