2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 148Get this manual

2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 148

Engine Mechanical:

Starter Cable Removal and Installation

Removal 1) Remove the front fenderRefer to "Exterior Parts Removal and Installation in Section 9D (Page 9D4)"2) Disconnect the clamp3) Remove the left handlebar switch box (1) and disconnect the starter cableB933H21406008

Installation Install the starter cable in the reverse order of removalPay attention to the following points: Install the starter cable as shown in the cable routing diagramRefer to "Hose and Cable Routing Diagram in Section 4A (Page 4A-3)" Align the groove of starter valve with the starter cable end
I933H1140016-01 I933H1140013-01

4) Disconnect the starter cable (2) from the throttle body assembly