2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 147Get this manual

2009 Suzuki 400 LTZ Quad Sport Service Manual, Page 147

1D-5 Engine Mechanical: 4) Disconnect the IAT sensor coupler (4)5) Remove the air cleaner box (5) by removing the air cleaner box mounting bolts Throttle Cable Removal and Installation

Removal 1) Remove the fuel tank and fuel tank lower coverRefer to "Fuel Tank Removal and Installation in Section 1G (Page 1G-9)"2) Remove the throttle cable as shown in the cable routing diagramRefer to "Hose and Cable Routing Diagram in Section 4A (Page 4A-3)"
B933H21406005

I933H1140010-01

Installation Install the throttle cable in the reverse order of removalPay attention to the following points: Install the throttle cable as shown in the cable routing diagramRefer to "Hose and Cable Routing Diagram in Section 4A (Page 4A-3)" Check the throttle cable play and proper operationRefer to "Throttle Cable Play Inspection and Adjustment in Section 0B (Page 0B-10)"