2008 Suzuki LT-A400/F, LT-F400/F ATV Service Manual, Page 463Get this manual

2008 Suzuki LT-A400/F, LT-F400/F ATV Service Manual, Page 463

SteeringHandlebar: Check the steering moves smoothly Check the wiring harness routing, cable routing and brake hose routingRefer to "Wiring Harness Routing Diagram in Section 9A (Page 9A-8)", "Brake Cable Routing Diagram in Section 4A (Page 4A-2)"and "Front Brake Hose Routing Diagram in Section 4A (Page 4A-1)" After installing the wheels, inspect the toe-inIf the toe-in is out of specification, bring it into the specified rangeRefer to "Steering System Inspection in Section 0B (Page 0B-18)" and "Toe-In Adjustment in Section 0B (Page 0B-18)" 6B-10

Tie-rod End Inspect the tie-rod ends for smooth movementIf there are any abnormalities, replace the tie-rod ends with new onesInspect the tie-rod end boots for wear or damageIf any defects are found, replace the tie-rod ends with new ones