2007-2009 Suzuki LTZ90 factory service manual, Page 165Get this manual
CHASSIS
INSTALLATION
Install the handlebars in the reverse order of removalPay attention to the following points: Apply adhesive agent to the handlebar right and left end and right and left grip inner wallHANDLE GRIP BOND (commercial available)
Apply handle grip bond