2009 Polaris Scrambler 500 4x4 2x4 factory service manual, Page 170Get this manual

2009 Polaris Scrambler 500 4x4 2x4 factory service manual, Page 170

FINAL DRIVE the boot kitDO NOT use substitute grease and DO NOT overfill or underfill the CV joint9Slide the new clamp and boot (small end first) over the splined shaft, then slide (tap) the CV joint into the splines of the axleInstall small boot clamp10Add grease through large end of boot11Position large end of boot on CV joint, purge excess air by partially compressing axle into CV bell, lift one edge of boot to let out excess air Secure with clampCV Joint Grease30g (PN 1350046) CV Boot Clamp Pliers: Earless Type (PN 8700226)