2009-2010 Polaris RZR Factory Service Manual, Page 230Get this manual

2009-2010 Polaris RZR Factory Service Manual, Page 230

FINAL DRIVE Bearing Installation 5Thoroughly clean the front bearing carrier housing and the outer race on the new bearingBe sure that all oil residue has been removed from each surfaceSupport the bottom of the bearing carrier housing3Install pinch bolts and torque to 17 ftlbs(23 Nm)CAUTION
Apply Loctite 603TM retaining compound to the outer circumference of the new bearing race and carefully press the new bearing into the bearing carrier housingPinch Bolts: