2009-2010 Polaris RZR Factory Service Manual, Page 105Get this manual

2009-2010 Polaris RZR Factory Service Manual, Page 105

ENGINE NOTE: Before assembly, clean the bolts and bolt holes with Primer (PN 2874275) to remove any debrisThis will ensure proper sealing when installing bolts37Install shaft seal with ceramic surface facing inward39Install water pump cover (R) with new O-ring sealTorque bolts to specification in proper sequence (see Page 3.4)38Install water pump impeller (P)Secure the impeller with the washer and new nylok nut (Q)Torque the nut to specification96 inlbs(10.85 0.35 Nm)