2008 Polaris Ranger RZR Service Manual, Page 204Get this manual

2008 Polaris Ranger RZR Service Manual, Page 204

FINAL DRIVE 9Add grease through large end of boot
Drive Shaft Installation
1Install new spring ring on drive shaftApply an anti-seize compound to splinesNEW Spring Ring

10Position large end of boot on CV joint, purge excess air by partially compressing axle into CV bellLift one edge of boot to let out excess airSecure the CV boot with clampFRONT DRIVE SHAFT Joint Capacity 45 Grams Plunging Joint

Apply Anti-Seize 2Align splines of drive shaft with front gearcase and reinstall the drive shaftUse rubber mallet to tap on the outboard end of the drive shaft if necessary