2008 Kawasaki Teryx 750 Service Manual, Page 231Get this manual

2008 Kawasaki Teryx 750 Service Manual, Page 231

CRANKSHAFTTRANSMISSION 9-15 CrankshaftConnection Rod
Connecting Rod Big End Side Clearance Inspection

Measure the side clearance of the connecting rod big end [A]Insert thickness gauge [B] between the big end and either crank web to determine clearanceConnecting Rod Big End Side Clearance Standard: 0.16 0.46 mm (0.0063 0.0181 in Service Limit: 0.7 mm (0.028 in

If the clearance exceeds the service limit, replace the connecting rod with new one and then check clearance againIf clearance is too large after connecting rod replacement, the crankshaft also must be replaced
Connecting Rod Big End BearingCrankpin Wear Inspection
Tighten the big end cap nuts to the specified torque