2005 Kawasaki KAF620 Mule 3010 Trans 4x4 Service Manual, Page 64Get this manual

2005 Kawasaki KAF620 Mule 3010 Trans 4x4 Service Manual, Page 64

3-8 FUEL SYSTEM Governor Link Mechanism
Control Panel Assembly Removal

Remove: Cargo Bed the pop rivets holding Drill outshroud [B] with [A]drill bit ofthe control panel assembly the mm (0.02 in
diameterDrill only until the rivet head comes offthrough the holeDo not drill

Remove:Panel Assembly Mounting Bolts [A], Collars and Control