2005 Kawasaki KAF400 Mule 600 and Mule 610 4x4 Service Manual, Page 64Get this manual

2005 Kawasaki KAF400 Mule 600 and Mule 610 4x4 Service Manual, Page 64

3-8 FUEL SYSTEM Governor Link Mechanism
Control Panel Assembly Removal

Tilt up the cargo bed[A] holding the control panel asthe pop rivets Drill outshroud [B] with drill bit of the mm (0.02 in sembly
diameterDrill only until the rivet head comes offthrough the holeDo not drill

Remove: Link [A]
Governor Spring [B] Plate Connection Bolts [C] Control Panel Mounting Bolts [D] Control Panel Assembly [E]