2009-2012 Honda MUV700 Big Red Service Manual, Page 281Get this manual

2009-2012 Honda MUV700 Big Red Service Manual, Page 281

SUB-TRANSMISSIONGEARSHIFT LINKAGE Coat new O-ring with eng ine oil and install it onto the oil filler pipeInstall the filler pipe ith the two boltsConnect th il filler hose onto the pipe Install the EOT se nsor with new seali ng asher and tighten itTORQUE12(1.2 kgfmIbf.ft )

Install the reduction gears and alternator cover (page 11 )
Connect th gear position switch 3P (black) co nnec torConnect the front propeller sh aft (page 10)Install the following- rear propeller shaft (page 812)starter motor (page 23-11- exhaust system (page 3-26)