2004 Bombardier Quest/Traxter Series Shop Manual, Page 198Get this manual

2004 Bombardier Quest/Traxter Series Shop Manual, Page 198

Section 03 ENGINE QUEST Subsection 11 (CVT)
Check for any marks on fixed half plateReplace if necessaryCheck ring gear teeth for excessive wear or other damageReplace fixed half if necessary
BUSHING BORE DIAMETER MINIMUM (new) MAXIMUM (new) SERVICE LIMIT 39.990 mm (1.574 in) 40.085 mm (1.578 in) 40.100 mm (1.579 in)

WARNING
Fixed half and ring gear are balanced togetherAlways replace both parts together otherwise severe injury andor damages may occurSpring Measure spring free length and squarenessIf spring is out of specification, replace by new oneSPRING FREE LENGTH SERVICE LIMIT 75 mm (2.953 in)

Measure length of spring sleeve no17 and check if edges on top of the spring sleeve are excessively wornIf they out of specifications, replace both spring sleeve at the same timeSPRING SLEEVE LENGTH SERVICE LIMIT mm (.276 in)

Assembly of Drive Pulley
For assembly, reverse the disassembly procedurePay attention to following detailsCAUTION: Centrifugal lever no15 and rollers no20 must move easily after installationInsert slider shoes into governor cup to properly slide in guides