2011 Arctic Cat 700 Diesel SD Service Manual, Page 41Get this manual

2011 Arctic Cat 700 Diesel SD Service Manual, Page 41


11Install the injector control rack by first engaging the governor linkage sleeve; then secure to the injection pump fuel controls with the pivot screwsTighten to 11 inlb
AT THIS POINT
If injectors were serviced, static injector timing must be set (see Top-Side Components in this section)
13Using new O-rings, install the fuel rail and secure with four Allen-head machine screwsTighten to 36 inlb